
In this project, the student team designed a fermentation system using knowledge from CENG4630 and CENG4620. They first created a detailed design of the whole system to treat sludge into organic fertilizer and to import the system into a prototype to enhance the feasibility of the design for the President’s Cup finals. The prototype was constructed in the USEL lab as the lab had adequate space for the assembly and tools required. |